Building permits for water damage repairs in Hillsborough

Hillsborough permit requirements depend on the repair scope; ask the Building Division about the proposed work before concealing or replacing damaged components.

Call (650) 550-0619

Describe the work to the town

The town says permit applications go through the electronic eTRAKiT portal and that separate permits are normally required for plumbing, electrical and heating or air-conditioning work. The town’s wording is “separate permits are required” normally for those trades. Describe the actual work; a general mold or drying discussion does not determine whether a particular repair needs a permit.

Arrange the inspection

Hillsborough says inspections are required for permitted work and asks that they be requested at least 48 hours in advance. Coordinate the inspection before work that must be viewed is concealed by new finishes. If opening the damaged assembly reveals a changed scope, discuss it with the town and the contractor.

Keep the records together

Retain the source-repair invoice, the town permit, inspection records and the restoration description. They answer different questions: a plumbing repair addresses the leak, while the assessment of wet material determines what remains to be cleaned and dried. Contact the Building Division at (650) 375-7411 for the specific project.

Sources

Restoration in Hillsborough

More resources

Tell us what’s happening.

Open your email app with a prepared message. You can review it before sending.