Building permits for water damage repairs in Los Gatos
A permit depends on the repair, the property’s jurisdiction and the work proposed. Ask the Los Gatos Building Division about the actual scope; water extraction alone should not be assumed to require the same permit as plumbing replacement.
Examples of town applications
Los Gatos offers online applications for a water heater replacement of the same type in the same location; a different type or location uses its building permit application. Its permit page lists water and sewer line replacement under plumbing work and notes a West Valley Sanitation District permit may also be required. Verify the property’s jurisdiction and actual connection.
Arrange inspection at the right stage
The town’s inspection portal states: “A permit must be "issued" in order to schedule inspections.” Its online scheduling applies to town building inspections; other agencies use their own procedures. Confirm which inspections apply and arrange them before work requiring inspection is concealed.
Keep the repair record
Describe the source repair, reconstruction and any electrical or mechanical work separately. If the scope changes after opening a wall, ask the permit holder and town how to proceed. Retain the permit, inspection record, photographs and work description; a cleanup report is not a permit approval.