First establish whether entry is allowed
Firefighters or a building official may restrict access after a fire. Follow their direction before entering, moving belongings or arranging an inspection inside. A damaged roof, floor or ceiling may be unstable, and water used to extinguish a fire can leave electrical equipment hazardous. Call 911 if there is an immediate threat to life.
When you can safely discuss the property, explain which areas burned, whether smoke reached other rooms and whether anyone has identified access restrictions. Let the person receiving the call know if utilities were shut off. These observations help plan an assessment; they cannot establish the full extent of damage without examining the site.
If entry is permitted and it is safe to do so, photograph visible conditions before moving significant contents. Keep the notices and instructions you received from responders. Do not disturb a scene that authorities have asked you to preserve. A record of what was accessible at the outset is useful if additional areas are examined later.
Different kinds of damage can overlap
Direct heat can damage building components in one area while soot settles on surfaces elsewhere. Water used in suppression can add another concern, particularly where it remains in a ceiling or floor assembly. Tell the assessment team what you observed, but avoid assuming that an odor or a visible stain identifies every affected material.
The assessment should identify the areas examined, their condition and any limits on access. A room that was closed at the time may need to be evaluated later. If removing a finish reveals additional damage, the scope may change; ask how the finding will be documented and who will approve any added work.
A qualified trade may be needed for electrical, plumbing or structural repairs. Restoration of soot-affected materials is a separate task from restoring a utility or rebuilding an assembly. Make the boundary between the scopes clear so that no essential step is left to an assumption that someone else will handle it.
For a multi-unit building, record whether access to each unit and any common area was available. Smoke movement and water paths can be difficult to establish while parts of the building are closed. The assessment should identify that uncertainty and explain when a further visit may be needed, rather than assigning a cause to an unexamined space.
Document an emergency repair request
Campbell’s Building Inspection application guide includes a request category for emergency repair after a fire, accident or disaster when the work must be performed immediately in the interest of public safety. The category addresses that specific situation; it does not mean that every stage of fire cleanup or rebuilding is automatically an emergency repair.
The guide asks for photographs showing the building damage and the areas needing emergency repair. If the property is safe to photograph, organize the images by location and keep a record of when they were taken. The Building Division can explain the application and the information needed for the actual work.
If responders have restricted entry, do not enter simply to obtain pictures. Discuss access and documentation with the responsible authority. Once the urgent condition is addressed, review the remaining repairs separately and identify who will coordinate plans, trades and any inspections.
A change in design may need a different process
Campbell’s emergency repair guide says that the request is for like-for-like work. If a proposed repair changes the building’s design or layout, the guide points to an appropriate building permit and a land-use permit where applicable. This is a distinction between scopes, not a requirement that all later reconstruction preserve the previous layout.
Before approving an expanded scope, ask which components will be replaced, whether the proposed work changes their configuration and which approvals are required. A fire-damaged wall, for example, may involve finishes, electrical wiring and framing. The relevant trade and city review depend on the work actually proposed and what the inspection reveals.
Keep decisions and changes in writing. If a contractor identifies a need to alter an approved plan, ask how that change will be reviewed before it is built. This helps the owner and the responsible professionals coordinate without treating the initial emergency request as approval for unrelated future work.
If reconstruction becomes substantial
Campbell’s building page says its 2024 air-quality ordinance addresses covered appliances and equipment in new buildings and substantial rebuilds using portions of existing buildings, subject to stated exceptions. The city must determine how the rules apply to a proposed project. Do not assume that a minor repair or smoke cleaning is a substantial rebuild.
If the project does involve extensive reconstruction, identify proposed heating, cooling and water-heating equipment early enough for the design team to discuss requirements with the city. The choice may affect plans and coordination among trades. The city’s notice and the applicable ordinance should be checked for current requirements and exceptions.
This is a project-planning question rather than an instruction to operate damaged equipment. Do not energize or restart a system affected by fire or water until the appropriate professional and utility have addressed it. Keep the inspection and permit records with the reconstruction documents.
Coordinate belongings, insurance and occupancy
Make a list of affected contents when it is safe. Different materials may need different evaluation, and a photograph cannot determine whether an item is suitable for cleaning. Before discarding significant property, ask the insurer how it should be documented, provided retaining it does not create a hazard or conflict with official instructions.
A tenant should coordinate building access and repairs with the housing provider. A business may need to identify records, equipment and areas that must remain closed. In each case, distinguish the building owner’s decisions from the contents owner’s decisions and record what was accessible during the initial assessment.
Coverage depends on the policy and the individual claim. Keep photographs, correspondence and receipts requested by the insurer or another qualified adviser. If an official restricts occupancy, ask what conditions must be satisfied before returning; completion of one cleaning task does not necessarily resolve every building safety issue.
Plan the handoff between trades
As the work progresses, ask for an updated explanation of the affected areas and any findings that change the original scope. Track who is responsible for source control, cleaning, material removal, repair and required inspection. If a trade needs access to a wall or ceiling, coordinate the sequence before a finish is restored.
At handoff, retain the work descriptions, permit records and inspection results that apply. Identify any remaining work and who will complete it. If a room has not been inspected because it remains inaccessible, record that limitation rather than treating it as an unaffected room.
Water Damage Guard accepts calls at (650) 550-0619, 24/7, from San Carlos. Describe the incident, the status of access and any continuing water or utility concern. An assessment can then be tailored to the actual property and the work needed.
Common questions
Can I enter a building after the fire is out?
Follow instructions from responders and the building authority. A structure may remain restricted or hazardous after flames are extinguished.
Does Campbell have an emergency repair application?
Its building guide includes a request for immediate repairs after a fire, accident or disaster when needed for public safety. Ask the Building Division whether the actual scope qualifies.
What does the emergency repair guide ask an applicant to provide?
The guide asks for photographs of the damage and areas requiring emergency repair, subject to safe access and official instructions.
Can a repair change the building layout under that request?
The guide limits the emergency repair request to like-for-like work. It says a design or layout change requires an appropriate building permit and land-use permit where applicable.
Does every fire cleanup trigger Campbell’s rebuild appliance rules?
No. The city describes rules for covered appliances in new buildings and substantial rebuilds. Confirm applicability and exceptions for the actual project.